It has been a while since my last update on the renovation progress. Since then, the lighting works are completed and the furniture installed. The clothes hanger system has been fixed up and the whole house has undergone 2 fresh coats of paint.
Here are some updated pictures of the progress :)
Our dining room with all the lights turned on. One bulb from the chandelier is missing, however, and the plastic is still used to cover the wall light for piano on the right.
A glance at our living room with all the lights switched on, too.
Our master bedroom bedframe, side-tables and bed-head all nicely done up. Some cleaning to be done before the final handover though :P All that is missing now is the matress and side-table lamps.
This is the chest of drawers opposite our king-sized bed. It comes with a nice slide-out table that we can use if we need to do some quick paper-work.
A look at the halogen-lights that will light up our bedroom
Our books-cum-storage shelves.
Incorporated with the slide-out work-table.
Our study table with enough space for the two of us, storage space at the top and a second tier shelf for putting the computer printer. There is also a fabric-covered metal board near the window for putting magnets. But we face a problem here though … magnets can’t stick on it at the moment.